{"id":23470,"date":"2020-05-20T10:59:20","date_gmt":"2020-05-20T17:59:20","guid":{"rendered":"https:\/\/www.casino.org\/vitalvegas\/?p=23470"},"modified":"2020-05-20T11:05:52","modified_gmt":"2020-05-20T18:05:52","slug":"elon-musks-boring-co-wraps-drilling-of-las-vegas-convention-center-tunnels","status":"publish","type":"post","link":"https:\/\/www.casino.org\/vitalvegas\/elon-musks-boring-co-wraps-drilling-of-las-vegas-convention-center-tunnels\/","title":{"rendered":"Elon Musk’s Boring Co. Wraps Drilling of Las Vegas Convention Center Tunnels"},"content":{"rendered":"\n

Construction has been completed on the second of two tunnels at the Las Vegas Convention Center. The tunnels are part of an underground transportation system conceived by Elon Musk.<\/p>\n

Musk’s Boring Company finished drilling the second tunnel on May 14, 2020.<\/p>\n

\"Elon
Tunnels and drilling and breaking through and paging Dr. Freud!<\/figcaption><\/figure>\n

The underground system, dubbed the Convention Center Loop, is set to cost $52.5 million and will move guests from one end of the sprawling, 200-acre Las Vegas Convention Center in less than two minutes.<\/p>\n

The tunnel system will utilize 62 all-electric Tesla vehicles. The system is designed to move up to 4,400 conventioneers per hour.<\/p>\n

Here’s the money shot!<\/p>\n

\n
\n
\n<\/span>